Microgrid Solutions

Packaged Microgrid Solutions for Critical Infrastructure

RV Sinkler manages the complete microgrid program under one coordinated delivery framework — engineering, procurement, construction, commissioning, and long-term support.

Packaged Microgrid Solutions

Resiliency Shouldn’t Come in Pieces.

Most microgrid projects fall apart in the gaps between vendors: one company handles the battery storage, another the switchgear, another the controls, and the owner is left coordinating all of it. RV Sinkler built its packaged solutions to close those gaps. Every package brings the full scope, engineering, procurement, construction, commissioning, and long-term support, together under one simplified solution, scaled to match the size of your facility, from a single critical building to a full district deployment. These packages are a starting point, not a fixed menu; every one is fully customizable to your project’s specific needs.

To make that flexibility easy to navigate, we organize it into three starting points, SITE, CAMPUS, and DISTRICT, each defined by the power and storage capacity a facility actually needs. Find the tier that matches your situation below: it tells you the scale of the system you’re likely looking at, the typical facilities it serves, and a realistic delivery timeline. From there, we tailor every detail to your specific site, but the tier gives you an immediate, honest starting point instead of an open-ended guess.

Three Starting Points

SITE · CAMPUS · DISTRICT

Each tier scales up from a single critical facility to district-level infrastructure — a starting point for sizing, always tailored to the specific site.

01
SITE Package

Site Package

Power
Up to 100 kW
Storage
Up to 200 kWh
Typical applications
  • · Fire station
  • · Police station
  • · Municipal building
  • · Emergency operations
  • · Water pump station
  • · Single critical facility
Core scope
  • · Load analysis
  • · System engineering
  • · Energy storage
  • · Automatic transfer equipment
  • · Controls
  • · Remote monitoring
  • · Installation
  • · Commissioning
  • · Operator training

Optional: Solar integration

Indicative implementation: 8–12 weeks after NTP, subject to project conditions

02
CAMPUS Package

Campus Package

Power
101–500 kW
Storage
≈ 500 kWh – 1 MWh
Typical applications
  • · Multi-facility campus
  • · Cooperative cluster
  • · Public-safety campus
  • · Institutional campus
  • · Municipal group
  • · Coordinated critical facilities
Core scope
  • · Multi-node controls
  • · Coordinated islanding
  • · Energy storage
  • · Distribution equipment
  • · Remote fleet monitoring
  • · Construction coordination
  • · Commissioning
  • · Training

Optional: Solar integration

Indicative implementation: 16–24 weeks, subject to project conditions

03
DISTRICT Package

District Package

Power
501 kW – 1 MW
Storage
≈ 1–4 MWh
Typical applications
  • · Substation
  • · Industrial critical load
  • · District resilience program
  • · Cooperative distribution
  • · Utility-level resilience
Core scope
  • · Advanced energy-management controls
  • · Medium-voltage integration
  • · SCADA coordination
  • · Cybersecurity coordination
  • · Energy storage
  • · Grid services
  • · Construction management
  • · Commissioning
  • · Monitoring

Optional: Solar generation · Generator integration · Additional DERs

Indicative implementation: 24–36 weeks, subject to project conditions

Package Comparison

Compare Microgrid Packages

AttributeSITECAMPUSDISTRICT
Power rangeUp to 100 kW101–500 kW501 kW – 1 MW
Storage rangeUp to 200 kWh≈ 500 kWh – 1 MWh≈ 1–4 MWh
Typical facilitiesSingle critical facilityMultiple facilitiesSubstation / district
Primary applicationPublic-safety / municipalCampus / cooperative clusterUtility / industrial critical load
Renewable optionSolar (optional)Solar (optional)Solar + additional DERs (optional)
MonitoringRemote monitoringRemote fleet monitoringSCADA-integrated advanced controls
CybersecurityStandard hardeningCoordinated multi-nodeFull cybersecurity coordination
Indicative delivery8–12 weeks16–24 weeks24–36 weeks
O&M availabilityOptional support planOptional support planOptional support plan

Final system sizing, technology selection, storage chemistry, schedule, and commercial terms depend on site conditions, load requirements, interconnection, permitting, equipment availability, applicable codes, and completed engineering.

Microgrid Value Pillars

Five Principles Behind Every System

  • When the grid goes down, critical loads shouldn't. Every system is engineered for automatic islanding, so backup power kicks in without manual intervention, keeping fire stations, water systems, and other critical facilities running exactly when they're needed most.

Battery Energy Storage Project

United Power

United Power Fire Station Microgrid Program — United Power Inc., Brighton, Colorado
Battery Energy Storage

United Power Fire Station Microgrid Program

United Power Inc. · Brighton, Colorado

RV Sinkler is serving as Prime Contractor for a multi-site Battery Energy Storage and Microgrid program supporting rural emergency services under Colorado's Microgrid Batteries initiative. The project delivers resilient energy infrastructure across four fire stations through integrated engineering, construction, commissioning and operations support.

Role
Prime Contractor
Contract value
$1,497,597.41
Status
Ongoing
Handover
Scheduled final handover: February 2027
View United Power Project

Design a Microgrid Program With RV Sinkler

Engage RV Sinkler for site evaluation, load analysis, and a coordinated microgrid delivery plan for your facility, campus, or district.