Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade — U.S. Army, Fort Riley, Kansas
U.S. Army | Critical Infrastructure

Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade

280 kW of distributed CHP generation supporting critical facilities across Fort Riley.

U.S. Army · Fort Riley, Kansas

8 CHP Systems
280 kW Combined Capacity
4 Building Groups
$2.24M Contract Value
Subcontractor / Technical Consultant
Completed June 2022
Certified & QualifiedSBA Small BusinessSBA 8(a) Business DevelopmentSAM.gov Registered
Project Overview

Executive Summary

RV Sinkler, as subcontractor and technical consultant to Aegis Energy Services, supported a turnkey Combined Heat & Power resiliency upgrade for Fort Riley, installing eight 35 kW CHP systems (280 kW combined) across four building groups: Eyster Pool, the Long Fitness Center, the installation Headquarters, and the Custer Hill Barracks complex. Each system was engineered to base-load the facility's existing thermal demand, heating, hot water and dehumidification loads, while adding on-site, natural-gas-fired generation capacity that keeps critical systems running if the base loses grid power.

Energy Systems Serving
  • Eyster Pool
  • Long Fitness Center
  • Installation Headquarters
  • Custer Hill Barracks complex
The Challenge

Engineering Resilience Into Critical Facilities

The Custer Hill Barracks buildings presented a distinct resiliency challenge: without backup power, their attic-mounted air handlers would shut down entirely during a grid outage, forcing evacuation of troops from their living quarters.

RV Sinkler supported the engineering of a solution that ties the CHP thermal output into the barracks' existing air-handling systems, allowing the buildings to maintain safe, breathable air during an outage without oversizing the generation equipment.

  • Engineering problem solving
  • Critical infrastructure experience
  • Resiliency engineering
  • Systems integration
  • Existing-facility integration
  • Mission-critical thinking
Project Delivery

Technical Consulting Support Across the Project Lifecycle

  1. Engineering Coordination
  2. Procurement Support
  3. Construction Support
  4. Commissioning

Aegis Energy Services held prime contract responsibility for the project. RV Sinkler supported the effort as subcontractor, providing technical consulting across:

  • Engineering coordination
  • Procurement support
  • Contract administration support
  • Systems integration support
  • Commissioning support
Technical Overview

System Configuration

Systems
8 Combined Heat & Power systems
Unit Capacity
35 kW each
Total Generation
280 kW
Building Groups
4
Energy Source
Natural gas
Thermal Applications
Heating · Hot water · Dehumidification · Air-handling support
Prime Contractor
Aegis Energy Services, Inc.
Project Highlights

What Defines This Project

8
CHP Systems
280 kW
Combined Generation
4
Building Groups
$2.24M
Contract Value
Sub
Technical Consultant
June 2022
Completed
  • 8 CHP systems / 280 kW combined generation capacity across 4 building groups
  • Engineered resiliency solution for barracks with no prior backup power capability
  • Delivered on time and within budget as subcontractor to Aegis Energy Services
  • Met Army energy efficiency and resiliency directive requirements
Compliance

Designed Around Federal Energy & Resiliency Requirements

  • Army Directive 2017-07
  • Executive Order 13693
Why This Project Matters

Resilience Beyond Backup Power

The Fort Riley project demonstrates RV Sinkler's ability to approach energy infrastructure as an integrated engineering challenge rather than simply an equipment installation.

By supporting the coordination of generation, thermal demand, existing building systems, procurement and commissioning, RV Sinkler helped deliver a solution designed around the operational requirements of critical military facilities.

Project Outcomes

Outcome

A completed federal critical-infrastructure CHP resiliency upgrade delivered on time and within budget as subcontractor and technical consultant to Aegis Energy Services, meeting Army energy efficiency and resiliency directive requirements.

Discuss Similar Infrastructure Projects

Bring RV Sinkler in early. We will review the requirements and define the engineering, procurement and construction path to commissioning.

WhatsApp