Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade — U.S. Army, Fort Riley, Kansas
U.S. Army | Critical Infrastructure

Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade

280 kW of distributed CHP generation supporting critical facilities across Fort Riley.

U.S. Army · Fort Riley, Kansas

8 CHP Systems
280 kW Combined Capacity
4 Building Groups
$2.24M Contract Value
Prime Contractor
Completed June 2022
Certified & QualifiedSBA Small BusinessSBA 8(a) Business DevelopmentSAM.gov Registered
Project Overview

Executive Summary

RV Sinkler delivered a turnkey Combined Heat & Power resiliency upgrade for Fort Riley, installing eight 35 kW CHP systems with 280 kW of combined generation capacity across four building groups. Each system was engineered to base-load the facility's existing thermal demand, including heating, hot water and dehumidification loads, while adding on-site natural-gas-fired generation capacity designed to keep critical systems operating during loss of grid power.

Energy Systems Serving
  • Eyster Pool
  • Long Fitness Center
  • Installation Headquarters
  • Custer Hill Barracks complex
The Challenge

Engineering Resilience Into Critical Facilities

The Custer Hill Barracks presented a distinct resiliency challenge. Without backup power, the attic-mounted air handlers would shut down entirely during a grid outage, potentially requiring evacuation of troops from their living quarters.

RV Sinkler engineered a solution that integrated CHP thermal output with the barracks' existing air-handling systems, allowing the buildings to maintain safe, breathable air during an outage without unnecessarily oversizing the generation equipment.

  • Engineering problem solving
  • Critical infrastructure experience
  • Resiliency engineering
  • Systems integration
  • Existing-facility integration
  • Mission-critical thinking
EPC Delivery

Prime Contractor Across the Full Project Lifecycle

  1. Engineering
  2. Procurement
  3. Construction
  4. Commissioning

As Prime Contractor, RV Sinkler managed the full project lifecycle, including:

  • Engineering coordination
  • Procurement
  • Contract administration
  • Financial administration
  • Construction management
  • Systems integration
  • Commissioning
Technical Overview

System Configuration

Systems
8 Combined Heat & Power systems
Unit Capacity
35 kW each
Total Generation
280 kW
Building Groups
4
Energy Source
Natural gas
Thermal Applications
Heating · Hot water · Dehumidification · Air-handling support
Application
Critical infrastructure resiliency and distributed generation
Project Highlights

What Defines This Project

8
CHP Systems
280 kW
Combined Generation
4
Building Groups
$2.24M
Contract Value
Prime
Contractor
June 2022
Completed
  • Engineered resiliency solution for barracks with no prior backup power capability
  • Integrated CHP thermal output into existing facility systems
  • Delivered on time
  • Delivered within budget
  • Met applicable Army energy-efficiency and resiliency requirements
Compliance

Designed Around Federal Energy & Resiliency Requirements

  • Army Directive 2017-07
  • Executive Order 13693
Why This Project Matters

Resilience Beyond Backup Power

The Fort Riley project demonstrates RV Sinkler's ability to approach energy infrastructure as an integrated engineering challenge rather than simply an equipment installation.

By coordinating generation, thermal demand, existing building systems, construction, procurement and commissioning, RV Sinkler delivered a solution designed around the operational requirements of critical military facilities.

Project Gallery

Site Documentation

Official project photography and video are published here once released by the client.

Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade project view 1Placeholder
Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade project view 2Placeholder
Fort Riley Combined Heat & Power (CHP) Resiliency Upgrade project view 3Placeholder
Project Outcomes

Outcome

A completed federal critical-infrastructure CHP resiliency upgrade delivered on time and within budget, meeting applicable Army energy-efficiency and resiliency requirements.